Toronto’s iconic College Park redevelopment at Yonge and College streets has undergone significant revisions in 2026. Designed by Hariri Pontarini Architects for GWL Realty Advisors, the updated three-tower plan swaps the heights of the north and south towers while slightly increasing the height of the central supertall 96-storey tower. These changes maintain the site’s density, expand amenity space, and enhance heritage preservation of the original Art Deco complex, including the famed Carlu event venue.
The College Park redevelopment, spanning 420–444 Yonge Street and 1–23 College Street, blends historic preservation with modern high-rise living. The revision reflects careful attention to heritage views, residential amenity needs, and improved accessibility to Toronto’s College subway station. This article details the revised proposal, its impact on housing and urban planning, and what it means for Toronto’s growing skyline.

Updated Tower Heights and Design Adjustments
The revised proposal modifies tower heights and massing while retaining the three-tower concept:
- North Tower: Now 65 storeys (235.23m), down from the previous 75, consolidating rental units.
- South Tower: Now 75 storeys (271.15m), up from the previous 65, adding residential and condominium units.
- Central Supertall Tower: Slightly taller at 344.29m while retaining its 96-storey height.
This height swap ensures minimal impact on heritage sightlines, particularly to Old City Hall and New City Hall, while slightly adjusting the Floor Space Index from 20.94 to 20.89. Total Gross Floor Area (GFA) is reduced marginally to 235,771m², maintaining density across the site.
Residential and Amenity Improvements
The redevelopment now proposes 2,339 residential units, a slight increase from 2,334 units in the 2025 plan. Key updates include:
- Consolidation of all rental housing in the North Tower, including 216 replacement units (down from 244), with a higher proportion of two- and three-bedroom units (up from 34% to 44%).
- Amenity space expansion from 11,467m² to 12,284m², with indoor areas increasing to 6,892m² and outdoor areas slightly reduced to 5,392m². Trellis structures mitigate wind at podiums.
- Bicycle parking increased from 2,980 to 3,189 spaces, improving convenience and accessibility.
- Retention of heritage façades along Yonge and College streets, along with interior restoration of the Carlu auditorium.

Heritage Conservation and Public Realm
Preservation of College Park’s historic Art Deco character remains central to the revised plan. ERA Architects lead heritage oversight, ensuring:
- Full conservation of Yonge and College street façades.
- Partial retention of south and west elevations with sensitive podium integration.
- Revitalization of ground-level arcade spaces and improved connections to public parkland, including Barbara Ann Scott Park expansion from 530m² to 600m².
The public realm benefits from canopied trellis structures that enhance pedestrian comfort and ground-level wind mitigation, reinforcing College Park as a major pedestrian gateway. (urbantoronto.ca)
Transportation and Connectivity
The site is directly linked to College subway station, with a new south entrance under construction, and is served by TTC surface routes on College, Carlton, Bay, and Yonge streets. Parking remains at 76 underground spaces, while bike access is upgraded, particularly for North Tower residents. These updates enhance connectivity and support sustainable transportation in one of Toronto’s busiest downtown corridors.
You can also check our blogs about 2026 Canadian Investor Mortgage Rules: 5 Key Impacts of the Delayed Crackdown and Macro Condo Investment Trends.
Nearby Developments and Skyline Context
College Park sits in a rapidly evolving stretch of Yonge Street:
- North: Proposed 31–33 storey The G2 towers, 75–78 storey 475 Yonge, and 80-storey 2 Carlton.
- South: 66-storey 415 Yonge, 75-storey 399 Yonge, 85-storey Concord Sky, 85-storey 372 Yonge, and Chelsea Green (31–90 storeys).
This redevelopment strengthens Toronto’s high-rise corridor, contributing to urban density, residential variety, and enhanced pedestrian infrastructure.
Conclusion
Toronto’s College Park redevelopment revision demonstrates a careful balance between heritage preservation, residential growth, and urban design excellence. The updated tower heights, improved amenities, and enhanced public realm highlight a project that is sensitive to both the historic context and the demands of a modern, dense downtown core. As construction progresses, College Park will continue to shape the city’s skyline while offering high-quality housing, cultural spaces, and improved connectivity.
